Jump to content

Celebrating Positives (offset of the Gripes Thread)


Jerry_Atrick

Recommended Posts

Here's a good news article, about a family of German tourists, who came across a big pod of dolphins (about 40 of them) "surfing" at a beach off Albany, W.A.

The family managed to catch the light and water clarity at the right time, and the photos and videos show the pod playing like regular human surfers, travelling along in the wave ahead of the break, and leaping out of the water above the breaking wave.

 

https://au.news.yahoo.com/travelling-family-captures-extraordinary-aussie-scene-nothing-like-it-back-home-201231692.html

  • Like 2
Link to comment
Share on other sites

The mutually beneficial situation between me and the house flippers is still working out. I did them a favour today by busting up and removing some waste concrete which will go straight in some holes in my driveway tomorrow when I muster the energy to unload it. Also on the load was a heap of new cyclone rods and some timber. He's ripping up the hotmix driveway in a couple of weeks and said he could get the contractor to dump it at my place. It's about two truckloads so that should fill a few more holes.

  • Like 1
Link to comment
Share on other sites

17 minutes ago, spacesailor said:

Two truck loads .

You must have big holes in your driveway.  LoL

spacesailor

It's long (about 500 metres) and steep. Over the years a lot of the depth has washed away so I could take ten or twelve truckloads easily if I wanted to get it back to the original levels. I remember when I first bought the block and put a driveway entrance in. I tried getting some road base in but a few feet in from the gate it turned to mush as I worked it. It was the wet season and a spring had broken out just where I'd put the entrance. I had a tractor and rolled in four truckloads of road base just in 15' of driveway before the mush was plugged and firmed up.

 

The next forty metres from there had cap rock underneath so I couldn't side cut into the hill. The only option was to build it up so four truckloads of shot rock boulders from the quarry went into that. I also put in fourteen truckloads of good fill on the rest of the drive that cost me nothing as a friend was digging a dam and wanted to get rid of it. I don't remember how many loads of road base went over the top of it but it was quite a few. Back when I first did the driveway was when I should have concreted it. What would have cost about $25,000 then is probably closer to $200,000 now.

  • Informative 2
Link to comment
Share on other sites

11 minutes ago, spacesailor said:

A pity you couldn't straighten it then a bit longer .

It could have been a " runway " . 

spacesailor

 

At least I get a bit of good plane spotting here. Since they built the new runway, the changed flight path sometimes takes them straight over the top of my place.

  • Informative 1
Link to comment
Share on other sites

In the future life is sure to get a bit easier for some disabled people due to technology evolving. This exoskeleton thing has a lot of potential. They will probably operate a lot smoother and more nimble as time goes by. Then there's the issue of affordability. This clip was previously posted in the Paris Olympics thread.

 

 

  • Like 1
  • Informative 1
Link to comment
Share on other sites

An exoskeleton for a paraplegic as the technology is now would only be usable for short periods. The biggest problem I see is chafing from the attachment points. The weight has to be taken on whatever straps hold the person in. They'll figure out something better eventually.

  • Like 1
  • Informative 1
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...